4.7 Water Cooled Condenser Assembly and Erection
4.7.1 Condenser(steam exhaust device)erection.
Applicable scope:applicable to condenser(steam exhaust device)erection,with the following inspection items:condenser(steam exhaust device)shell assembly,condenser(steam exhaust device)in place and alignment.
1 Condenser(steam exhaust device)shell assembly inspection and acceptance are given in Table 4.7.1-1
Table 4.7.1-1 Condenser(steam exhaust device)shell assembly
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_289.jpg?sign=1739523412-JPdhVfyRwiTG9RpgkBEFwBxum64nU1qh-0-7e04543f08fa048ba2bdc74aaebaa11f)
2 Condenser(steam exhaust device)in place and alignment inspection and acceptance are given in Table 4.7.1-2.
Table 4.7.1-2 Condenser(steam exhaust device)in place and alignment
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_290.jpg?sign=1739523412-PawyHwzssvFnMKM3SOJw2iwPA5vlXQIT-0-92733151be63f1f85675a1909b0288cb)
4.7.2 Condenser cooling tube bundle erection inspection and acceptance are given in Table 4.7.2.
Table 4.7.2 Condenser cooling tube bundle erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_291.jpg?sign=1739523412-2ksMqV4Hn3j9ALKjIZ6CqgoAe9ETcdZ5-0-69de910a31bef99dfe0622a88a3e66c4)
Table 4.7.2(Continued)
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_292.jpg?sign=1739523412-yoVwVUbdPixrgpJtTFiZrh9Pkb22VMdA-0-cc91fea06b0a58ca1f239cbcd5655623)
4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test inspection and acceptance are given in Table 4.7.3.
Table 4.7.3 Condenser(steam exhaust device)and cylinder connection and leakage test
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_293.jpg?sign=1739523412-r4KQRqnPjthR66gyRFmJFCIgC2s67juZ-0-0b29fcf1b526d15bcaeabe6785d49d3e)
4.7.4 Condenser(steam exhaust device)accessories erection and secondary grouting inspection and acceptance are given in Table 4.7.4.
Table 4.7.4 Condenser(steam exhaust device)accessories erection and Secondary grouting
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_294.jpg?sign=1739523412-432zpjGLt7RQRTC3vL4FT9RkDonEfJcr-0-2aba14a6ea50109fc460dd037f5c3ce7)
4.7.5 Rubber ball cleaner inspection and erection inspection and acceptance are given in Table 4.7.5.
Table 4.7.5 Rubber Ball Cleaner Inspection and Erection
![img](https://epubservercos.yuewen.com/DE2F71/18000634808204306/epubprivate/OEBPS/Images/txt004_295.jpg?sign=1739523412-Yw5M2LsyEgY6zlOPs88iBAkQuToT4AKK-0-e3541c5db329d15d388a5eac327a06a1)
4.7.6 Mandatory provision implementation inspection of water cooled condenser assembly erection is given in Table 4.7.6.
Table 4.7.6 Mandatory provision implementation inspection table of water cooled condenser assembly erection subsection project